Your present position:Home >> Use and Maintenance of Air-jet Loom
Use and Maintenance of Air-jet Loom
Time:[2019-8-7]    Pageview:8623

Use and maintenance of air-jet looms:

I. Periodic Maintenance

1.Daily maintenance and handling

Maintenance workers need to carry out routine maintenance of electric oil pump, centralized oil supply, heat dissipation part of main motor, input shaft of open cam box, electromagnetic brake, weft detector, scissors, winch, side brace and edge-trapping yarn.

2.Maintenance and disposal of machine time

Check whether the side brace ring rotates flexibly, whether it is worn, whether there are flying flowers, whether the interval between stop pin and main drum is 0.5 mm, whether the air pipe leaks, whether the centralized oil supply leaks, whether the oil pipe is damaged or bent, whether there are flying flowers in the control box, confirm whether the height error of the heald frame is less than 2 mm, and whether the air filter exhausts. Whether the pipe is unblocked, whether there are flying flowers on the pinion of the warp shaft, whether there is yarn head on the bevel gear shaft of the opening device, whether the screen hole on the oil filter is blocked, whether yarn head is rolled on the warp let-off and loosening axles, whether there is damage to the insulating sleeve of the wire and whether the clearance of the brake is correct. Fuel the nozzle, the gear face and chain of the open gear, and check whether the heald frame and the guide plate of the heald frame are worn or not.

3.Half-yearly overhaul and treatment

It is necessary to check whether the winding is clean, whether there are yarn marks and scars on the main drum and pin drum, whether the inside of the stop pin assembly is dirty, whether the open wire rope is elongated or damaged, whether the recovery spring is damaged, and whether the bearing of the open wire rope connecting seat is worn. Whether the belt tension is appropriate or not, whether there is damage, whether the sensors are working properly, whether the transmission gear box, coiling gear box and sending gear box are replaced with lubricating oil, whether the filter sieve is blocked, whether the reed is stained with dirt, whether the wind speed value is normal, and whether the U-shaped shaft lining of the pull-down hook is normal. Whether the wear is less than 2 mm, whether the main nozzle duct is bent, whether the coiling roller chain is elongated, whether the clearance between planetary gears is normal, whether the wear of the axle lining of the planetary tube seat is less than O.5 mm, whether the wear of the axle lining of the planetary tube is less than 0.5 mm, whether the wear of the axle lining of the planetary tube is less than O.5 mm, whether the auxiliary nozzle is scratched or not. There are yarn marks, whether bending or not, whether there is oil in the scissors device, and so on.

4.One-year overhaul and disposal

Whether the screw of the support foot of the main nozzle is loose or not, the screw should be tightened again.

5.Overhaul and disposal in two years

Whether the winding roll, pressing roll and rough rubber are worn, whether the warp and warp parts of the warp axle are worn within 0.3 mm, whether the buffer performance is reduced, whether the nylon bushing and the guide pin column of the buffer are worn, whether the auxiliary nozzle is dirty, whether the weft is cut correctly by the side shearing device of the yarn supply, whether the stop pin hole of the stop pin assembly is worn or not. Whether the wear of the roll shaft of the coiling cloth is less than 0.5 mm or not is less than 0.5 mm.

6.Overhaul and disposal in three years

Whether the lubricating oil of solenoid valve is insufficient and whether the coiling cloth roll rotates flexibly.

7.Seven-year overhaul

It includes the maintenance of bearings, oil seals, gears, cams, axle linings, stop pins, main motors, frame, opening, warp feeding, winding and weft storage parts.

二、Contents and Notices to be Preserved by Loom Institutions after Long-term Use

(1)Main transmission part: After long-term use of the loom, it is necessary to replace the oil seal of the crankshaft bearing seat of the driving part.

(2)Opening part: It is necessary to replace the cam open arm bearing, wire rope, heald spring and heald arm bearing.

(3)Replacement of synchronous toothed belt and cleaning of oil filter.

(4)Clean reed regularly.

(5)The inner parts of the length measuring and weft storage drum are replaced, the inner parts of the stop pin are replaced, and the encoder is cleaned.

(6)Main nozzle cleaning, filter cleaning, cleaning and repair of solenoid valve and pressure regulating valve, inspection and configuration of gas pipe.

(7)Servo motor maintenance and replacement, buffer repair and internal parts replacement.

(8)Check coiling brake rollers, chains, tensioning wheels, adjusting pins and replacement, maintenance and replacement of friction discs and discs. Inspection and replacement of rough rubber.

(9)Check and replace planetary gear, tube bearing, guide arm shaft and coupling.

(10)Inspection and replacement of weft detection cable

Previous: 暫無

Next: 噴氣織機:賣點在于低耗

六月丁香亚洲综合电影网| 久久久久久久tu| 中文字幕无码精品| 天天影视淫色人妻一区| 97久久久精品黄片一黄片一二三 | 亚洲国产日韩av| 午夜一区二区三区| 欧美7区视频在线观看| 密臀成人福利在线| 五月日韩欧美视频| 911亚洲福利视频| 国产婷婷在线91| 免费网站免费观看蜜桃射破屁屁| 一本二本大道二卡| 绿色www在线观看| 久久久久加勒比无码| 五月丁香亚洲aa| 欧美一区日韩精品| 东京热男人.ab| 免费网站拍拍男女| 亚洲高清无码区亚州天堂高清无码| 国产视频――98| 69AV天堂影院| AV一区不卡免费| 亚洲午夜性爱网站| 亚洲天堂免费网站| 熟女成人一区二区| 狠狠躁夜夜躁人人爽超碰白浆| 激情五月无码视频| 欧洲综合精品在线| 欧美成人超碰| 激情五月天色婷婷一区二区三区| 肉伦伦国产嗷嗷叫| 色欲sv一线久久| 丁香五月天婷啪啪| 五月婷婷校园春色| 国产成人无码电影| 亚洲无码国产精品| 一区二区黄色小说| 中文字幕亚洲国产无码欧偷动| 色丁香悠悠五月天|